← All work
Case StudyTier BPrototype~2023

Divar Property Visit Scheduling Hackathon Prototype

Hackathon concept for coordinating property-visit scheduling around a classifieds journey.

ProductTechnical

Context

~2023 · Hackathon prototype · Maturity: Prototype.

Problem

Scheduling visits around property listings creates coordination friction between interested users and listing owners/agents.

Users

Hackathon/product-design context.

My Role

4-person team; product idea/design and technical discussion.

Product Decisions & Responsibilities

  • Contributed to problem framing, product idea, and interaction design.

Technical Approach

  • Participated in technical feasibility discussion.
Product designTechnical feasibility

Constraints

  • Number of competing teams is not documented.
  • Prototype/hackathon context only.

Product Flow

  1. Open listing
  2. Request visit slot
  3. Coordinate availability
  4. Confirm appointment

Outcome

  • Roughly 5th place in the hackathon.

What I Learned

  • Distribution and workflow context can matter as much as feature novelty.

Evidence Boundary

What this does — and does not — prove

Rank remains approximate; competitor count is not claimed.

Next Iteration

Extend the product only after the next decision can be tied to stronger user, operational, or business evidence rather than adding features for their own sake.